July 2026
13.07.2026
Building 1:
Section 1:
- Monolithic frame, vertical waterproofing, brickwork, and excavation works completed
- Wall plastering and section framing works have begun
- Roofing installation and the fitting of aluminum and window structures are underway
Section 2:
• Piling work completed
Parking:
- Monolithic frame construction for parking lots No. 1, 2, and 3 completed
- Horizontal waterproofing of the foundation for parking lot No. 2 is nearing completion
Overall:
- Sewer riser installation completed
- Electrical wiring installation for apartments is nearing completion